…
Step by step. With respect for the place.
01 / Assess
Site study, noise, transport, utilities and the city’s needs. A sound foundation before a specific design.
02 / Prepare
Zoning change, permits, partner agreements and supporting infrastructure design.
03 / Develop
Phased development according to demand and confirmed infrastructure. Green spaces in every phase.
Energy from rooftops
We will assess solar panels on roofs and canopies.
Water managed locally
Rainwater retention and reuse depend on hydrogeological assessment.
Green from phase one
The goal is to connect buildings, paths and shared spaces with greenery.
The place first. Its design comes next.
Architectural visualizations and a film will follow verification of the site layout and constraints. For now, we show the actual orthophoto and the functional concept.
Sources and context3
- Územní plán Cheb — úplné znění po Změně č. 29
- Studie proveditelnosti SPP Cheb — manažerské shrnutí
- Plán rozvoje distribuční soustavy 2026–2035
Based on sources recorded as of 17 October 2026. Future milestones are plans of their respective owners, not delivery guarantees.