Site, strategic park and the planned substation.
Parcel boundaries are based on ČÚZK WFS. Neighbouring project layers describe cadastral context, not approved building footprints.
Close to the action.
With space of its own.
Kampus Dvory is a separate private concept. Its location suggests potential to complement the neighbouring strategic park; it is not part of it or an approved extension.
Road access
The site is accessed from road III/0218. The future campus requires traffic capacity and safety assessment.
Utilities
TR Dvory is planned nearby. Grid connection, fibre connectivity and water infrastructure all require separate confirmation.
Constraints to address
Road and utility protection zones, noise, agricultural land and height constraints. Building layout must follow a verified site study.
Driving distances and journey times are not yet published: specific routes require verification. Fibre connection to this site is also unconfirmed.
Sources and context5
- geometrie a výměry parcel (řešený pozemek: 185/1, 185/9, 185/15, 185/4, 358
- Územní plán Cheb — úplné znění po Změně č. 29
- EIA MZP539 Mercedes-Benz Truck Park v Chebu (dokumentace PDF 8,5 MB, přílohy 85 MB)
- Studie proveditelnosti SPP Cheb — manažerské shrnutí
- Plán rozvoje distribuční soustavy 2026–2035
Based on sources recorded as of 17 October 2026. Future milestones are plans of their respective owners, not delivery guarantees.